What is a Cyclonic Vacuum Cleaner?
the BIM model is one ‘view’ of the data set, not the other way round).
Lamont believes we need BIM 19650 in terms of language and connectivity to ensure we’re getting the consistency of outcome we require.However, he doesn’t think BIM on its own is going to save the day in terms of driving industry change.
He says both prescription and innovation have a role to play.With respect to 19650 and UK standards, he says there’s a recognition in Australia that some kind of standard is needed to meet the requirement, but currently people are doing a little bit of their own thing.This is creating confusion surrounding outputs in terms of what people are receiving and why.
Currently, after designers create the concept design (including testing related to the engineering), things get handed over to the contractors to de-risk the program, make changes, and make the design work for them.They then deliver what’s left back to the client.
Lamont doesn’t believe it’s necessarily the best process.. On the other side of things, there are governments trying to lead the path to innovation.
In the UK there’s Level 2 BIM.Delivering pipework pre-assembled and ready for installation makes transport and on-site logistics much more efficient.
There is no requirement for on-site storage of parts, preparation, cutting, assembly or waste disposal.All of this is particularly important on a constrained site in central London.. At the Forge, we have over 40 riser modules, over 800 fan coil and pipe modules, and over 1300 comflor panels to contain the cabling and sprinkler pipework.
This represents approx.of modules and just 10% of onsite installations, which means a smaller team of operatives on site, working more efficiently..